Up

Downloads

Click here to Download the Terms and conditions of participation
Click here to Download the Summits Prospectus
1.1 Introduction to trenchless technology - Dr Dec Downey, Immediate Past Chairman, ISTT, UK
2.1 Sea outfalls and shore crossings through mechanised tunnelling - Ben Hayes, Herrenknecht-Asia
2.2 Preparation of jacking and receiving pits with the help of SBH Shoring - Gaurav Aggarwal, Manager-India Operations, SBH Tiefbautechnik, Germany
2.3 Long distance pipe jacking: Problems and solutions - Yu Bin Quan, Guangxin Heavy Equipment, China
3.1 Horizontal Directional Drilling (HDD) - Dr Sam Ariaratnam, Chairman, ISTT, USA
4.1 On-grade boring in high compaction soils and rock - John Milligan, Vermeer Corporation, USA
4.2 Risk mitigation measures - Ehteshamul Haque, DCI India
4.3 Intake and Outfall Microtunnel Construction at Kovaya - Coastal Marine Construction and Engineering Ltd
5.1 Pipe Bursting, the equipment, capabilities and planning considerations - Dr Samuel Ariaratnam, Chairman, ISTT, USA
6.2 Trenchless culvert replacement under railways with the pipe ramming method - Sean Wharton, International Sales Manager Asia, Hammerhead, USA
7.1 Trenchless pipeline rehabilitation methods - Dr Dec Downey, Past Chairman, ISTT, UK
8.1 Trenchless replacement with Wavin TS pipes - Wim Elzink, International product manager, Infrastructure, Wavin Overseas BV, The Netherlands
8.2 Machine wound spiral lining: an Indian experience - Venkataraman Ramesh, General Manager Pipeline Rehabilitation, Shriram EPC, India
8.3 Close-fit lining with compact pipe - Wim Elzink, International product manager, Infrastructure, Wavin Overseas BV, The Netherlands
Conference Programme 2012
Book Now - Click here to download the sponsorship application form
 
 
Powered by Phoca Download

Sponsor Logos

Sponsor Logos

No-Dig India Logo